For cost comparisons of an SCS Coil Line and a P&O line click the buttons below:

In addition to Equipment Costs, consider the impact
of facility capital cost:

 - A typical P&O line requires
   50,000 sq.ft. of floor space.

 - An SCS Coil Line requires
   just 2000 sq. ft. of space.


SCS Coil Line specs:

 
 -  0.250" material thickness
  -  72" maximum width
  -  50,000 lb. max. coil weight

  - 150 feet/minute line speed

In this comparison, each line processes 200,000 tons/year.

Comparison includes interest payments on capital at 10%/yr.



.........SCS vs. P&O CAPITAL COSTS

    - P&O Equipment Cost Averages $15 Million.

    - SCS Coil Line Equipment Cost **
..
           Single Brush Unit                      Dual Brush Unit
                 $2.8 million                                $3.6 million
           18,000 tons/month                  32,000 tons/month


    - SCS Sheet Line Equipment Cost **
             Single Brush Unit                      Dual Brush Unit
                 $1.3 million                                $2.1 million
           10,000 tons/month                  18,000 tons/month


  
  ** for US domestic delivery. SCS License Fee not included.

......SCS vs. P&O OPERATING COSTS

    - P&O Operating Cost Averages $15/ton.

    - SCS Variable Operating Costs. **

 

       Coil Line       

     Sheet Line      

          Brushes:  
          Labor: 

          
Electricity:
  
        Filters & Water: 

$ 0.84/ton
$ 1.00/ton
 ($18/hr. x 2)
$ 1.40/ton
$ 0.20/ton

$ 2.40/ton
$ 1.00/ton
 ($18/hr. x 1)
$ 1.40/ton
$ 0.20/ton

 TOTAL: 

 $ 3.44/ton 

$ 5.00/ton

 ** costs for Single Brusher configuration. A Dual Brusher line will
     increase throughput per man-hour to cut labor cost by 40%.