For cost comparisons of an SCS Coil Line and a P&O line click the buttons below:
In addition to Equipment Costs, consider the impact
of facility capital cost:
- A typical P&O line requires
50,000 sq.ft. of floor space.
- An SCS Coil Line requires
just 2000 sq. ft. of space.
SCS Coil Line specs:
- 0.250" material thickness - 72" maximum width - 50,000 lb. max. coil weight
- 150 feet/minute line speed
In this comparison, each line processes 200,000 tons/year.
Comparison includes interest payments on capital at 10%/yr.
|
.........SCS vs. P&O CAPITAL COSTS
- P&O Equipment Cost Averages $15 Million.
- SCS Coil Line Equipment Cost **
.. Single Brush Unit Dual Brush Unit
$2.8 million $3.6 million
18,000 tons/month 32,000 tons/month
- SCS Sheet Line Equipment Cost **
Single Brush Unit Dual Brush Unit
$1.3 million $2.1 million 10,000 tons/month 18,000 tons/month
** for US domestic delivery. SCS License Fee not included.
......SCS vs. P&O OPERATING COSTS
- P&O Operating Cost Averages $15/ton.
|
- SCS Variable Operating Costs. **
|
|
|
Coil Line
|
Sheet Line
|
|
Brushes:
Labor:
Electricity:
Filters & Water:
|
$ 0.84/ton
$ 1.00/ton
($18/hr. x 2)
$ 1.40/ton
$ 0.20/ton
|
$ 2.40/ton
$ 1.00/ton
($18/hr. x 1)
$ 1.40/ton
$ 0.20/ton
|
|
TOTAL:
|
$ 3.44/ton
|
$ 5.00/ton
|
** costs for Single Brusher configuration. A Dual Brusher line will
increase throughput per man-hour to cut labor cost by 40%.
|